    Windows and Doors

    Doors are being installed and so are windows! We have all of the windows in actually, except for one pesky piece that was backordered. But it should be ready by the end of the week! Installation has been fairly easy for the window team, just apply some skyscraper tape and stick them up there, well not quite that easy, we will now have to begin cladding the window frames in their finish material. The doors have been tricky with their sliding hardware but Laurie is doing a great job installing them. We can’t wait to get a picture of the front door after it has been installed. Sara and Jason also spent the first half of the day stripping and sanding the back deck door so that we can start installing it as soon as possible!