Contact

We love hearing from students, supporters, and friends. Please feel free to reach out with questions or with requests related to press.

  • The University of Utah

    College of Architecture + Planning

    375 S. 1530 E., Rm. 332 Arch

    SLC, UT 84112

  • Close

    Session III Wrap Up

    The end of Session III consisted of a lot of work by many teams. Here’s a look at how the session ended.

    plaster tools

     

    attaching chicken screen to the north wall before base coat is applied

    attaching chicken screen to the north wall before base coat is applied

    plaster21
    Atsushi & Hiroko applying base coat

    Atsushi & Hiroko applying base coat

    finished base coat, ready for finish coat!

    finished base coat, ready for finish coat!

    mixing up the finish coat

    mixing up the finish coat

    Catalina & Atsushi applying the finish coat

    Catalina & Atsushi applying the finish coat

    base vs. finish, with a control joint in between

    base vs. finish, with a control joint in between

    finished plaster work

    finished plaster work

    screen mock-up over the aluminum cladding

    screen mock-up over the aluminum cladding

    recessed downspout

    recessed downspout

    patio roof beam ready for joists

    patio roof beam ready for joists

    patio roof joists going in

    patio roof joists going in

    roof31
    finished patio roof structure: column, flitch plate, beam, and joists

    finished patio roof structure: column, flitch plate, beam, and joists

    patio roof ready for layer of OSB and the rest of the Grace Ice & Water Shield

    patio roof ready for layer of OSB and the rest of the Grace Ice & Water Shield

    looks like someone is sanding kitchen cabinets!

    looks like someone is sanding kitchen cabinets!

    halls of OSB ready for cedar cladding

    halls of OSB ready for cedar cladding

    east brows and entry brow

    east brows and entry brow

    west brows

    west brows

    Seth & Anna C installing the entry door

    Seth & Anna C installing the entry door

    scaffold jungle!

    scaffold jungle!

    welding supplies

    welding supplies

    hall closet door will blend seamlessly with surrounding cedar cladding when finished

    hall closet door will blend seamlessly with surrounding cedar cladding when finished

    everyone signed the house on the wall studs before receiving drywall-- even our client Harvey!

    everyone signed the house on the wall studs before receiving drywall– even our client Harvey!

    end of session III

    end of session III

    Erica on the planer, as session 4 will consist of a LOT of planing cedar for our interior wall cladding

    Erica on the planer, as session 4 will consist of a LOT of planing cedar for our interior wall cladding

    before shot of the cedar

    before shot of the cedar

    and the after of the cedar once planed and ripped into 2" strips

    and the after of the cedar once planed and ripped into 2″ strips