Contact

We love hearing from students, supporters, and friends. Please feel free to reach out with questions or with requests related to press.

  • The University of Utah

    College of Architecture + Planning

    375 S. 1530 E., Rm. 332 Arch

    SLC, UT 84112

  • Close

    March 27: Siding and the Masonry Heater

    As the construction of the masonry heater quickly progresses on the interior, the siding is going up on the exterior. Installation on the south wall is complete while teams have begun to figure out new conditions on the east wall and soffit connection. Our client visited the site this week and she is equally, if not more excited than we are about the siding. The masons keep telling us that we’re crazy for continually taking off and putting back on the siding. We argue that we’re not crazy, we’re architecture students.

    Masonry Heater

    Masonry Heater

    The guts of the heater

    The guts of the heater

    Matthew installing the siding on the south wall

    Matthew installing the siding on the south wall

    Steph getting dirty for the sake of the siding

    Steph getting dirty for the sake of the siding

    South Elevation- March 27

    South Elevation- March 27